Please click the photos for a closer look.


November 2002
Administrative center Dining Room Gazebo Covered leash relieving area Meeting room Administrative Center




May 2002

Kennel LoadingBay Patio Station TileDetail



April 2002

Front entrance to residence Lobby/Main entrance Commercial kitchen Sound proofing panels in kennel Leash relieving station


March 2002
Main conference room New administrative offices Main hall in residence Entranceway in residence New kennel


February 2002
Upper level of National Administration Center. Hallway in Residence Leading to Rooms Dining room Dining Room Upper level office space
Hall Leading to Student Union MVC-019L


January 2002
Inside the new training kennel. South view of Student Residence. West view of Student Residence. Southwest view of the student residence. Northeast view of student residence.


November—December 2001

Southwest view of Student Residence. South view of Student Residence. Northeast view of Student Residence. Northeast view of Student Residence. West view of Student Residence.


October 2001
Front view of Student Union. Back of Student Union. Side of Administrative Center. Interior of new Training Kennel. Side view of Student Union.


September 2001

South view of dorm. Deep foundation for the dorm construction. Frontloader with a full load of earth. Facing work on front of dorm. Excavation around foundation of dorm expansion.


August 2001
Foundation for new section of dorm. Dormitory construction front view. Dormitory construction front/side view. Dormitory construction front/side view. Dormitory back view.


June—July 2001
View of the gutted dorm Another view of the gutted dorm. Putting in drainage system. Heavy equipment on the campus Installing pipe for drainage system